On December 7, 2020, Azamat from Tajikistan sent us an electric hoist inquiry.
Good afternoon,
To implement the current project, we need Telphers and Hoist with an electric drive listed by the
Telpher with a lifting capacity of 10t - 2pcs
Telpher with a lifting capacity of 5 t - 1 piece
Telpher with lifting capacity 3t - 3pcs
Hoist with an electric drive with a lifting capacity of 2 tons - 4 pieces.
Please provide a commercial proposal for this equipment. If you have any questions, please contact me.
We are confused by the word “Telpher”, we don’t know what lifting product it is. Electric hoist is usually called “Hoist”, but in the customer's country, it has another name "Telpher". After confirming with the customer, we learned the exact needs of the customer:
electric wire rope hoist 10t — 12m
electric wire rope hoist 5t — 9m
electric wire rope hoist 3t — 9m
electric chain hoist with hook type 2t — 7m
In accordance with the customer's request, we sent a detailed quotation to the customer. The customer said that his bridge crane needed a 0.4Kw 1400rpm motor, but as there is no nameplate and no more detailed information about the motor, we can’t provide him with a matching motor, so we can't quote.
In the subsequent communication, the customer changed the parameters of the electric hoist.
Please update your latest offer based on the information below:
electric wire rope hoist 15t with a control unit for the movement of the crane beam - lifting height 12m - 2pcs
electric wire rope hoist 5t with a control unit for the movement of the crane beam - lifting height 9m - 1pc
electric wire rope hoist 3t with a crane movement control unit (1 unit needed) - lifting height 9m - 3pcs
electric chain hoist with hook type 2t - lifting height 7m.
Since the hoists are to use the customer's existing overhead crane, the customer confirmed the information of the hoist trolley to determine whether the hoist can run on his main beam. At the same time, he also asked how long the production time will take. We answered them one by one. Electric hoist products can meet his needs, so, the customer placed an order. At present, the order has been completed production. the logistics have been temporarily suspended due to the Spring Festival holiday. After the logistics resume, we will send the goods to customers as soon as possible.